News

Here is where you’ll find all the latest news, views, and opinions from Orwell Design Associates.

Madrid Distribution Centre Site Survey

27 May 2026Madrid Distribution Centre Site Survey

Last week, ODA’s Senior Mechanical Designer, Michael Picchi, Senior Electrical Designer, Arkadiusz Satro, and Refrigeration Design Engineer, Irshad Mohammad, attended a 2-day site visit near Madrid.

The team was asked to review the condition and installation of an existing distribution centre for a global company looking to occupy the building. The site consisted of multiple cold stores, freezer and ambient storage areas, including prep areas and offices.

A mechanical, electrical and refrigeration survey was carried out so we could inform the client of what they have, and don’t have on site, and we’ll soon be sending across a report of our findings. This information will enable the client to consider all the practical, technical and commercial implications before progressing with the site, supporting informed decision-making and reducing risk at an early stage.

If you’re reviewing a site or planning a new facility, speak to our consultancy team for clear, practical advice from day one.

Back to News